PORTFOLIO
SAFETY | QUALITY | RELIABILITY
POWER PLANT ANNOUNCEMENT!
We are happy to announce the formation of Aglow Power Plant Portfolio for 2025! Our team is excited to release the concept drawings of the first approved project to retrofit an existing mill building into Aglow's own hydrogen power plant. To meet IRA/ITC tax benefits, our team will be exploring H2 applications with hydroponic farming as a carbon capture system (CCS) on the backend of fuel cells through CHP technologies. This marks Aglow entry into owner/operator status with commitment to bring 150MW of clean renewable energy to New England by 2030!
Solar Panels & Hydrogen Electrolyzer
CHP for Hydroponics Heating & Carbon Capture
IN PROGRESS
28 Apartment Units - Fitchburg, MA
Aglow Owned & Developed
RESIDENTIAL. Aglow Team together with Red Spruce Holdings has purchased an existing brick building for the purpose of converting into 28 luxury apartment buildings. This project is 100% owned and operated by Aglow's Development Team.
SCOPE. Turnkey design/build of entire building including MEPS, interiors, exteriors, and energy efficiency systems. Aglow is investing $3M of private funds and financing $3M more with financial institution. Purchase was a cash buy.
IN PROGRESS
Electrical Upgrades - Various Locations, MA
Engineering & Electrical
INFRASTRUCTURE. Aglow Team has been retained as Tier 1 inspect and recommend selective electrical equipment upgrades for federal buildings in Massachusetts.
SCOPE. Turnkey inspect, design, and budgetary recommendations for upgrading selective electrical equipment in critical condition. Regions include federal buildings in Massachusetts and Affordable Housing.
Pre-Construction
300,000SF Warehouse - Enfield, CT
Engineering & Electrical
WAREHOUSE Aglow team is designing and building the electrical and CCTV infrastructure for a ground-up Aglow's team working directly with owners to value-engineering options to reduce construction cost without trading-off unique brand features.
SCOPE. Survey and design power distribution, load calculation, fire alarm, and future proofs. Project require close coordination with Eversource and owners for optimum design and parts sourcing.
IN DESIGN
Self Storage (3-Story) - West Haven, CT
Engineering & Electrical
COMMERCIAL REAL ESTATE. Aglow's team is under contract for Tier 2 design-and-build of a three-story climate control self storage project for a private equity investor.
SCOPE. Design electrical infrastructure, value-add alternate energy source integration, and general electrical and fire alarm services.
IN PROGRESS
150,000SF Warehouse - Methuen, MA
Engineering & Electrical
WAREHOUSE Aglow team is designing and building the electrical and CCTV infrastructure for a ground-up Aglow's team working directly with owners to value-engineering options to reduce construction cost without trading-off unique brand features.
SCOPE. Survey and design power distribution, load calculation, fire alarm, and future proofs. Project require close coordination with Natinoal Grid and owners for optimum design and parts sourcing.
IN PROGRESS
Walmart's Robotic Upgrade - Salem, NH
Engineering & Electrical
RETROFIT. Aglow team has been retained to build-out the electrical and BAS for Walmart's new robotic systems in Salem, MA. This represents Walmart's first robotics rollout in New England, which means our that team has the honor to help shape deployment strategy for future installations.
SCOPE. power distribution upgrade, new 9,000SF space fitted out for robotic equipment, HVAC upgrades, building automation, energy management, and refrigeration.
Pre-Construction
15KV Medium Voltage Upgrade - WRJ, VT
Electrical & Controls
Veterans Affair. Aglow team to procure, install, and maintain new 15KV medium voltage switchgear for VA's hospital in White River Junction, VT. This project is prevailing wages, bond policy, and covers predictive maintenance services.
SCOPE. Existing MV switchgear to be demo, Aglow's Tier 2 design to be adopted, new BIM for undergrounds, disconnect switches, fire alarm tie-in, energy management, and additional capital improvements.
Pre-Construction
Chiller Replacement - Brockton, MA
Electrical & Controls
Veterans Affair. Aglow team to procure, install, and maintain new chiller power distribution, backup generator, and controllers for VA's hospital in Brockton, MA. This project is prevailing wages, bond policy, and covers predictive maintenance services.
SCOPE. Existing VA hospital to completely upgrade chiller and generator systems. Aglow's Tier 2 design to be adopted, new BIM for undergrounds, disconnect switches, fire alarm tie-in, energy management, and additional capital improvements.
IN DESIGN
Power Plant Generator Upgrades
Electrical & Controls
SNEC. Aglow team to design, procure, install, and maintain new improvements to existing natural-gas fueled power plant. Older power plant requires major capital improvement overhaul to continue servicing critical buildings tied-in to its microgrid. Power plant has been acquired by SNEC, a long-time client of Aglow.
SCOPE. Existing power plant requires panelboard improvement, new controllers (SCADA/PLCS/VFD), and fire protection. Aglow shall take on the roll of EPC for all operations, including adjacent services such as fire alarm tie-in, gas metering, oil metering, energy management, and future improvements. $5,000,000 budget.
IN PROGRESS
White City Plaza - Shrewsbury, MA
Engineering & Electrical
INLAND HOLDINGS. Aglow team has been retained to design/build power distribution solution for multiple panelboards and switchgear where OEMs are out of circulation. 3D printing of breaker brackets required to meet firm two weeks turnover.
SCOPE. Electrical stand-alone EPC to replace switchgear, panelboards, and transformer without interrupting shopping plaza operations. Aglow to provide two (02) crews, standby generator, and approved contingency plan. OSHA testimony to be present.
COMPLETE
WALMART - NIAGRA FALLS, NY
Electrical & Controls
WALMART. New Refrigeration system is being retrofitted in Walmart's OGP area and Aglow was retained to complete the entire electrical and energy management and commission new HVAC systems. Novar controller specialization applied.
Scope. Firm five-weeks to procure, install, and certify original MEP scope. Aglow subcontracted a local crew for a two shift schedule and retained one electrician to respond to possible service calls. Novar controllers executed by direct Aglow personnel.
PLANING & STAGING
Mansfield Crossing - Mansfield, MA
Engineering & Electrical
WS DEVELOPMENT. Aglow team has been retained to design/build power distribution solution for multiple panelboards and switchgear where OEMs are out of circulation. 3D printing of breaker brackets required to meet firm two weeks turnover.
SCOPE. Electrical stand-alone EPC to replace switchgear, panelboards, and transformer without interrupting shopping plaza operations. Aglow to provide two (02) crews, standby generator, and approved contingency plan. OSHA testimony to be present.
MAINTENANCE
AUC POWER HOUSE - LANCASTER, MA
Electrical & Controls
Progressive decommissioning of entire campus service connection from power plant and tie-in to utility grid.
SCOPE. Technical consulting, field verification, proposal, and executable tasks require to disconnect buildings power service from plant generator and connecting to local electrical grid.
COMPLETE
WALMART - Woodsville, NH
Electrical & EMS
WALMART. New Refrigeration system is being retrofitted in Walmart's OGP area and Aglow was retained to complete the entire electrical and energy management.
Scope. Firm three-weeks to procure, install, and certify new power distribution (design/build style) and perform original MEP scope. Aglow subcontracted a local crew for a two shift schedule and retained one electrician to respond to possible service calls.
COMPLETE
WALMART - CORTLAND, NY
Electrical & EMS
WALMART. New Refrigeration system is being retrofitted in Walmart's OGP area and Aglow was retained to complete the entire electrical and energy management and replace faulty power distribution panel and switchgear.
Scope. Firm three-weeks to procure, install, and certify new power distribution (design/build style) and perform original MEP scope. Aglow subcontracted a local crew for a two shift schedule and retained one electrician to respond to possible service calls
IN PROGRESS
Somersworth Industrial Park - Building #1
Engineering & Electrical
STORAGE & FLEX SPACE - 16,000SF. Aglow team is designing and building the electrical, CCTV, and fire alarm infrastructure for mix-use industrial space. Building #1 is sub-divided into eight (08) tenants and shall be ready to move in. 1600A 120/208V Service.
SCOPE. Survey and design power distribution, load calculation, CCTV installation, and client-specific power requirements. Project require close coordination with Eversource and owners for optimum design and parts sourcing.
IN PROGRESS
Somersworth Industrial Park - Building #2
Engineering & Electrical
STORAGE & FLEX SPACE - 16,000SF. Aglow team is designing and building the electrical, CCTV, and fire alarm infrastructure for mix-use industrial space. Building #2 is a shell building and is shall be marketed as build-to-suit with 1200A 277/480V power signature.
SCOPE. Survey and design power distribution, load calculation, CCTV installation, and client-specific power requirements. Project require close coordination with Eversource and owners for optimum design and parts sourcing.
IN PROGRESS
Somersworth Industrial Park - Building #3
Engineering & Electrical
STORAGE & FLEX SPACE - 8,000SF. Aglow team is designing and building the electrical, CCTV, and fire alarm infrastructure for mix-use industrial space. Building #3 is a shell building and is shall be marketed as build-to-suit with 800A 277/480V power signature.
SCOPE. Survey and design power distribution, load calculation, CCTV installation, and client-specific power requirements. Project require close coordination with Eversource and owners for optimum design and parts sourcing.
PERMITTING
Red Spruce Industrial Park - Casco, ME
Engineering & Electrical
STORAGE & FLEX SPACE. Aglow team is designing and building the electrical and CCTV infrastructure for existing facility that will be expanded and retrofitted. Aglow's team working directly with owners to value-engineering options to reduce construction cost without trading-off unique brand features.
SCOPE. Survey and design power distribution, load calculation, CCTV installation, and client-specific power requirements. Phase 1 - Site Upgrade & four buildings: $9,500,00.00
COMPLETE
TARGET - GREENLAND, NH
Engineering & Electrical
TARGET/TENANT. Aglow team is participating in bringing beauty product retailer ULTA and other to Kohl's sales floor through electrical and engineering services. This project will be in conjunction with four (04) other stores highlighting Aglow's organizational capabilities.
SCOPE. Field verification of existing store layout and power structure to provide dedicated power and data rough-ins for new space. A shall be complete in firm five (05) weeks without disrupting store operations and budget overruns.
COMPLETE
ALL PURPOSE STORAGE - WEARE, NH
Engineering & Electrical
STORAGE & FLEX SPACE. Aglow team is designing and building the electrical and CCTV infrastructure for existing facility that will be expanded and retrofitted. Aglow's team working directly with owners to value-engineering options to reduce construction cost without trading-off unique brand features.
SCOPE. Survey and design power distribution, load calculation, CCTV installation, and client-specific power requirements. Project require close coordination with Eversource and owners for optimum design and parts sourcing.
COMPLETE
ALL PURPOSE STORAGE - CANTERBURY, NH
Engineering, Electrical & CCTV
STORAGE & FLEX SPACE. Aglow team is designing and building the electrical, CCTV, and fire alarm infrastructure for mix-use industrial space. Aglow's team working directly with owners to value-engineering options to reduce construction cost without trading-off unique brand features.
SCOPE. Survey and design power distribution, load calculation, CCTV installation, and client-specific power requirements. Project require close coordination with Eversource and owners for optimum design and parts sourcing.
COMPLETE
300,000SF WAREHOUSE DEVELOPMENT
Engineering & Electrical
PRIVATE EQUITY. Aglow team is design and building turnkey electrical infrastructure for ground-up warehouse. Design to focus on future alternative energy tie-in, tenant expansion, and fire pump consideration.
SCOPE. Survey and design power distribution, load calculation, fire alarm, and future proofs. Project require close coordination with Natinoal Grid and owners for optimum design and parts sourcing.
COMPLETE
Kohl's/Sephora - Woodbury, NY
Engineering & Electrical
SEPHORA. Aglow team is participating in bringing beauty product retailer Sephora to Kohl's sales floor through electrical and engineering services. This project will be in conjunction with four (04) other stores highlighting Aglow's organizational capabilities.
SCOPE. Field verification of existing store layout and power structure to provide dedicated power and data rough-ins for new space. A shall be complete in firm three (03) weeks without disrupting store operations and budget overruns.
COMPLETE
Kohl's/Sephora - Hackettstown, NJ,
Engineering & Electrical
SEPHORA. Aglow team is participating in bringing beauty product retailer Sephora to Kohl's sales floor through electrical and engineering services. This project will be in conjunction with four (04) other stores highlighting Aglow's organizational capabilities.
SCOPE. Field verification of existing store layout and power structure to provide dedicated power and data rough-ins for new space. A shall be complete in firm three (03) weeks without disrupting store operations and budget overruns.
COMPLETE
Kohl's/Sephora - Buffalo, NY
Engineering & Electrical
SEPHORA. Aglow team is participating in bringing beauty product retailer Sephora to Kohl's sales floor through electrical and engineering services. This project will be in conjunction with four (04) other stores highlighting Aglow's organizational capabilities.
SCOPE. Field verification of existing store layout and power structure to provide dedicated power and data rough-ins for new space. A shall be complete in firm three (03) weeks without disrupting store operations and budget overruns.
COMPLETE
Kohl's/Sephora - Hamden, CT
Engineering & Electrical
SEPHORA. Aglow team is participating in bringing beauty product retailer Sephora to Kohl's sales floor through electrical and engineering services. This project will be in conjunction with four (04) other stores highlighting Aglow's organizational capabilities.
SCOPE. Field verification of existing store layout and power structure to provide dedicated power and data rough-ins for new space. A shall be complete in firm three (03) weeks without disrupting store operations and budget overruns.
PERMITTING
Kohl's/Sephora - Bedford Hills, NY
Engineering & Electrical
SEPHORA. Aglow team is participating in bringing beauty product retailer Sephora to Kohl's sales floor through electrical and engineering services. This project will be in conjunction with four (04) other stores highlighting Aglow's organizational capabilities.
SCOPE. Field verification of existing store layout and power structure to provide dedicated power and data rough-ins for new space. A shall be complete in firm three (03) weeks without disrupting store operations and budget overruns.
COMPLETE
Ocean State Job Lot - Enfield, CT
FIRE ALARM DESIGN & BUILD
RETAIL FIT OUT. Aglow team was onboarded last minute to re-designed and built entire fire alarm system after original contractor abandoned project . Using warehoused parts, project was complete in four (04) days.
SCOPE. Brand new fire alarm system installation tied-in with sprinkler and mechanical contractor to meet code requirements for existing building layout. Aglow became Tier 1 designer, installer and monitoring company of record. Project was completed in firm five (05) business days without budget overruns.
COMPLETE
Advance Auto Parts - Manchester, NH
Engineering & Electrical
RETAIL. Aglow team to execute new Advance Auto Parts (AAP) fit out initiative in Manchester, NH. Project to include equipment repurpose and new installations to meet store physical and asset requirement.
SCOPE. Field verify and install new power distribution, load calculation, general lighting, life safety, HVAC power and low-voltage rough-ins.
IN PROGRESS
PRIVATE INVESTOR - NEW BEDFORD, MA
FIRE ALARM DESIGN & BUILD
BOARDROOM. Aglow team is designing and building entire fire alarm system for private equity firm investment property. Objective is to coordinate with local AHJ, design minimum requirement, and qualify building for capital asset rebate.
SCOPE. Field survey and coordination with sprinkler contractor to meet code requirements for existing building layout. Aglow is Tier 1 designer and will also be the installer and monitoring company of record. Project shall be complete in firm two (02) weeks without budget overruns.
IN PROGRESS
WCN City Transfer - New Bedford, MA
Engineering, Electrical, and Fire Alarm
TRASH TRANSFER STATION. Aglow team is to design and build turnkey fire alarm for previously transfer station that caught on fire. Furthermore, Aglow shall provide electrical services to new mechanical and general purpose equipment and systems.
SCOPE. Field verify existing conditions and provide workaround options to power new mechanical and special utility equipment in main hanger. Fire Alarm design and build for transfer station and adjacent office space. Significant homerun branch circuits (ELE & FAS) and workaround options to meet facility's layout.
COMPLETE
ALL PURPOSE STORAGE - NEWPORT, NH
Engineering, Electrical & CCTV
STORAGE & FLEX SPACE. Aglow team is designing and building the electrical, CCTV, and fire alarm infrastructure for mix-use industrial space. Aglow's team working directly with owners to value-engineering options to reduce construction cost without trading-off unique brand features.
SCOPE. Survey and design power distribution, load calculation, CCTV installation, and client-specific power requirements. Project require close coordination with Eversource and owners for optimum design and parts sourcing.
COMPLETE
ALL PURPOSE STORAGE - RINDGE, NH
Engineering, Electrical & CCTV
STORAGE & FLEX SPACE. Aglow team is designing and building the electrical and CCTV infrastructure for existing facility that will be expanded and retrofitted. Aglow's team working directly with owners to value-engineering options to reduce construction cost without trading-off unique brand features.
SCOPE. Survey and design power distribution, load calculation, CCTV installation, and client-specific power requirements. Project require close coordination with Eversource and owners for optimum design and parts sourcing.
COMPLETE
ALL PURPOSE STORAGE - BERNARDSTON, MA
Engineering, Electrical & CCTV
STORAGE & FLEX SPACE. Aglow team is designing and building the electrical and CCTV infrastructure for existing facility that will be expanded and retrofitted. Aglow's team working directly with owners to value-engineering options to reduce construction cost without trading-off unique brand features.
SCOPE. Survey and design power distribution, load calculation, CCTV installation, and client-specific power requirements. Project require close coordination with Eversource and owners for optimum design and parts sourcing.
COMPLETE
THE LITTLE GYM - WESTBOROUGH, MA
Electrical & Fire Alarm
Fit out of new Little Gym franchise building including design-and-build Fire Alarm, new lighting (LED efficiency and brighter), electrical outlets and special equipment.
SCOPE. Turnkey electrical solution to provide energy efficient lighting configuration (Mass Save), power redistribution to meet new building requirement, design-build fire alarm, and low-voltage rough-ins.
IN PROGRESS
ALL PURPOSE STORAGE - SANDHILL, NH
Engineering, Electrical, CCTV
FACILITY #3. Electrical & CCTV design and build of new ground up self storage facility in Swanzey, NH under All Purpose Storage brandname.
SCOPE. Survey and design power distribution, load calculation, CCTV installation, and client-specific power requirements. Project require close coordination with Eversource and owners for optimum design and parts sourcing.
COMPLETE
ALL PURPOSE STORAGE - SWANZEY, NH
Engineering, Electrical, CCTV
FACILITY #1. Electrical & CCTV design and build of new ground up self storage facility in Swanzey, NH under All Purpose Storage brandname.
SCOPE. Survey and design power distribution, load calculation, CCTV installation, and client-specific power requirements. Project require close coordination with Eversource and owners for optimum design and parts sourcing.
COMPLETE
ALL PURPOSE STORAGE - Hillsboro (EAST), NH
Engineering, Electrical, CCTV
Retrofit of existing storage facility into the All Purpose Storage brand with value-added features.
SCOPE. Assessment of existing infrastructure and installation of new underground conduit network for value-added features including; powered gate, access keypad, data/telephone bank, and CCTV security system.
COMPLETE
ALL PURPOSE STORAGE - Hillsboro (WEST), NH
Engineering, Electrical, CCTV
Retrofit of existing storage facility into the All Purpose Storage brand with value-added features.
SCOPE. Assessment of existing infrastructure and installation of new underground conduit network for value-added features including; powered gate, access keypad, data/telephone bank, and CCTV security system.
COMPLETE
RECREATION CENTER - LANCASTER, MA
Engineering & Electrical
Existing 20,000 square foot recreational center required disconnecting power distribution from a local power plant and connect to utility grid.
SCOPE. Survey and design power distribution configuration to remove power source from existing power plant feeder, reconfigure switchgear and panelboard to be connected to town's utility grid.
COMPLETE
MULTI-FAMILY - LANCASTER, MA
Engineering & Electrical
Existing six family residential family (used to be university housing) required disconnecting power distribution from local power plant and connect to utility grid.
SCOPE. Survey and design power distribution configuration to remove power source from existing power plant feeder, reconfigure switchgear and panelboard to be connected to town's utility grid.
COMPLETE
PETCO - SHREWSBURY, MA
Electrical & Controls
New veterinary care office and office alteration in existing Petco store.
SCOPE. Turnkey electrical solution to new power distribution system require to modify and feed veterinary equipment, exam rooms, HVAC appliances, and low-voltage rough-ins.
COMPLETE
PETCO - MANSFIELD, MA
Electrical & Controls
New veterinary care office and office alteration in existing Petco store.
SCOPE. Turnkey electrical solution to new power distribution system require to modify and feed veterinary equipment, exam rooms, HVAC appliances, and low-voltage rough-ins.
COMPLETE
AUC GI HOUSING LANCASTER, MA
Electrical & Fire Alarm
Upgrade smoke alarm and electrical system to meet code requirement in efforts to sell units.
Scope. Disconnect power service from power plant and tie-in to utility grid, upgrade local smoke alarm, and provide power and controller wiring to new sewer pump.
COMPLETE
WESTIN HOTEL - COPLEY SQUARE, BOSTON, MA
Fire Alarm
Modification and expansion of existing fire alarm system to meet modification and upgrade requirements.
SCOPE. Field verification of existing system and expansion capability and propose executable tasks to modify and install additional appliances.
COMPLETE
LOWE'S - AVON, MA
Electrical & Controls
New Lowe's Outlet building fit out with minor building improvements.
Scope. Extensive electrical demolition, retrofit of entire building lighting, installation of new power distribution panels, branch circuits, and HVAC equipment power and controls.
COMPLETE
Family Dollar - Wallingford, VT
Electrical & Controls
New Family Dollar store building fit out to include extensive new branch circuits and new cooler/freezer power and controls.
Scope. Turnkey electrical service from demolition to installation and termination of all general electrical, energy management, HVAC appliances, refrigeration, security, lighting, and other store specific high-dollar machinery.
COMPLETE
WALMART & TENANT - Sanford, ME
Electrical
FIT OUT. Demolition and complete electrical fit out of Claire's store inside Walmart. Fit out to included extensive new branch circuits, lighting, EMS tie-in, and cash wraps.
Scope. Turnkey electrical service from demolition to installation and termination of all general electrical, energy management, HVAC appliances, security, lighting, and other store specific equipment commissioning.
COMPLETE
WALMART & TENANT - Rochester, NH
Electrical
FIT OUT. Demolition and complete electrical fit out of Claire's store inside Walmart. Fit out to included extensive new branch circuits, lighting, EMS tie-in, and cash wraps.
Scope. Turnkey electrical service from demolition to installation and termination of all general electrical, energy management, HVAC appliances, security, lighting, and other store specific equipment commissioning.
COMPLETE
HOME DEPOT - WORCESTER, MA
ELECTRICAL, FIRE ALARM, AND CONTROLS
New Home Depot Tool Rental Space fit out to include extensive demolition and new cooler/freezer power and controls.
Scope. Turnkey electrical service from demolition to installation and termination of all general electrical, energy management, HVAC appliances, refrigeration, security, lighting, and other store specific high-dollar machinery.
COMPLETE
LOWE'S - MEDFORD, MA
Electrical & Controls
New Lowe's Outlet building fit out with minor building improvements.
Scope. Extensive electrical demolition, retrofit of entire building lighting, installation of new power distribution panels, branch circuits, and HVAC equipment power and controls.
COMPLETE
WALMART & TENANT - Biddeford, ME
Electrical
FIT OUT. Demolition and complete electrical fit out of Claire's store inside Walmart. Fit out to included extensive new branch circuits, lighting, EMS tie-in, and cash wraps.
Scope. Turnkey electrical service from demolition to installation and termination of all general electrical, energy management, HVAC appliances, security, lighting, and other store specific equipment commissioning.
COMPLETE
THAYER MUSIC CONSERVATORY - LANCASTER, MA
POWER DISTRIBUTION
Remove existing 400A service from power plant and connect to local power utility grid.
Scope. Design and calculate power distribution and execute transfer of service from power plant to utility ground through +300FT of underground service.
COMPLETE
REOBOTE CHURCH - FRAMINGHAM, MA
Fire Alarm
Abandoned new fire alarm system project required re-design, engineering submittals, and budget-friendly service to complete service.
Scope. Full system inspection, new drawings and submittals, and troubleshooting FACP to meet NFPA-72 and local AHJ requirements.
COMPLETE
CHANDLER ESTATES - TAUNTON, MA
Fire Alarm
Deficiency report and reliability study of existing 25 multi-apartment building and issue corrective work order to meet minimum code compliancy.
Scope. Visual and functional test of existing local 120V smoke alarm and low-voltage fire alarm and correct all failed units.
COMPLETE
THE PEARL - SOUTH BAY, MA
Fire Alarm
New high-end restaurant building fit out in South Bay, Boston Area.
Scope. Installation of new fire alarm system included general appliances, ANSUL System, sprinkler tie-in, HVAC equipment, and interconnection with existing Simplex control panel.
COMPLETE
COURTYARD - WORCESTER, MA
Electrical
Periodic hotel room electrical upgrades.
Scope. Demolition and re-installation of hotel room outlets, bathroom GFCIs, lighting, and panelboard circuitry to meet golden hospitality grade requirements.
COMPLETE
DOLLAR TREE - BURLINGTON, MA
Fire Alarm
Design & Build Full Fire Alarm System for Dollar Tree retailer and tied-in with existing landlord FACP.
Scope. Turnkey fire alarm design-and-built service to meet safety benchmarks required by NFPA-72 and local AHJ. Additional sprinkler, HVAC, and EMS tie-in included.
COMPLETE
PINE STREET TOWNHOUSES - ATTLEBORO, MA
Fire Alarm
Design & Build of fire alarm for ground-up multi-residential townhouse.
Scope. Turnkey fire alarm design, installation, 24/7 monitoring, and certification per NFPA-72 and AHJ requirements. Sprinkler tie-in included.
COMPLETE
QUEST DIAGNOSTIC - WORCESTER, MA
Fire Alarm
Redesign and installation of fire alarm system to new Quest Diagnostic clinic in existing office building.
Scope. Calculation, redesign, and installation of new fire alarm appliances to be tied-in to new clinical space. Cooperation with Simplex and landlord to install FACT, expansion cabinet, and auxiliary equipment to supply added load.
COMPLETE
THE PEARL - DORCHESTER, MA
Fire Alarm
COCKTAIL BAR. Redesign and installation of fire alarm system to tied-in with high end building fire alarm system.
Scope. Calculation, redesign, and installation of new fire alarm appliances to be tied-in to new clinical space. Cooperation with Simplex and landlord to install FACT, expansion cabinet, and auxiliary equipment to supply added load.
COMPLETE
WALMART - Ware, MA
Electrical & EMS
New Refrigeration and office power for OGP.
Scope. New power and controller solution for refrigeration, signs, and network tie-ins. Project performed in bundle rollout.
COMPLETE
THE NAIL BAR - SOUTH BAY, MA
FIRE ALARM
New private label nail spa building fit out in South Bay, Boston Area.
Scope. Installation of new fire alarm system included general appliances, sprinkler tie-in, HVAC equipment, and interconnection with existing Siemens control panel.
COMPLETE
423 - 432 PARK AVE - WORCESTER, MA
Fire Alarm & Smoke Alarm
Reliability study and corrective work order of existing building to meet minimum code compliance for finalize building sales.
Scope. Extensive assessment and corrective services to install brand new low-voltage fire alarm system in multi-purpose commercial/residential building.
COMPLETE
WALMART - HALIFAX, MA
Electrical & EMS
New Refrigeration and office power for OGP.
Scope. New power and controller solution for refrigeration, signs, and network tie-ins. Project performed in bundle rollout.
COMPLETE
WALMART - NIAGRA FALLS, NY
Electrical & EMS
New Refrigeration and office power for OGP.
Scope. New power and controller solution for refrigeration, signs, and network tie-ins. Project performed in bundle rollout.
COMPLETE
WALMART - SPRINGFIELD, MA
Electrical & EMS
New Refrigeration and office power for OGP.
Scope. New power and controller solution for refrigeration, signs, and network tie-ins. Project performed in bundle rollout.
COMPLETE
MULTI-APARTMENT COMPLEX - LEOMINSTER, MA
Electrical & Fire Alarm
Ground up turnkey electrical and fire alarm for six-family residential.
Scope. Design and Build of electrical power distribution, general power, lighting, heating/cooling systems, and network systems. Design and build of fire alarm (still monitored today).
Contact Our Estimating Team Today!
Jay Cunha or
Ashlyn Hart
+1 (800) 210-5698 Ext. 2